August

September

April

 

June 2005 Status

bullet06/29, Con't vinyl trim & siding
bullet06/28, Began ipe decking
bullet06/28, Began vinyl trim & siding
bullet06/27, Installed exterior doors
bullet06/27, Installed soffit
bullet06/27, Finished sheeting low walk out end
bullet06/23, Finished cedar header on porch
bullet06/23, Started framing walkout end
bullet06/23, Finished installing windows
bullet06/23, Ridge vent installed
bullet06/22, Ridge vent delivered
bullet06/22, Installed egress window
bullet06/22, Started soffits
bullet06/22, Finished roof shingles & began installing windows
bullet06/22, Poured garage floor
bullet06/22, Started cedar cover on porch header
bullet06/21, Cedar boards for porch delivered
bullet06/21, Porch addition ground level with original
bullet06/21, Second coat on basement floor
bullet06/21, Soffit delivered
bullet06/21, Started soffit framing
bullet06/21, Con't roofing
bullet06/20, Windows & exterior doors delivered
bullet06/20, Framed porch header
bullet06/20, Finished bathroom framing changes
bullet06/20, Framed in fireplace
bullet06/20, Con't roofing
bullet06/17, Framed in Chimney
bullet06/17, Finished porch joists & posts
bullet06/17, Second grind on basement floor
bullet06/17, Added gravel & stakes to garage floor
bullet06/17, Bought garage floor drain tile
bullet06/16, Poured forms for porch addition
bullet06/16, First grind on basement floor
bullet06/16, Wrapped house & con't roofing
bullet06/15, Second skim on basement floor
bullet06/15, Con't roofing
bullet06/15, Began to set porch joists & posts
bullet06/15, Poured footings for porch addition
bullet06/14, Dug trench for porch addition
bullet06/14, Started roofing
bullet06/13, Problem: porch roof trusses did not line up with porch foundation.  Error result of previous basement dimension error.  Solution: extend the porch foundation 8" on one end - that way the porch foundation will be extended roof trusses 8" on all sides.
bullet06/13, Roof Shingles delivered on roof
bullet06/10, First skim on basement floor
bullet06/10, Finished roof felt paper
bullet06/09, Filled basement floor cracks
bullet06/09, Finished framing soffits & sheeting
bullet06/08, Con't framing soffits & con't sheeting
bullet06/07, Con't framing soffits & con't sheeting
bullet06/07, Cleaned basement floor & dug out cracks
bullet06/06, Started framing soffits & con't sheeting
bullet06/03, Completed 2nd retaining wall
bullet06/03, Roof trusses were installed
bullet06/01, Continued sheeting exterior, cut windows & doors out, and framed garage door wall

 

May 2005 Status

bullet05/28, Backfilled black dirt behind house
bullet05/28, Set egress window well
bullet05/28, Set one retaining wall off walkout
bullet05/28, Leveled porch dirt
bullet05/28, Finished filling garage with gravel
bullet05/27, Continued sheeting & framing
bullet05/26, Cut large garage door to 18"
bullet05/26, Started sheeting exterior
bullet05/26, Framed garage exterior walls
bullet05/24, Finished framing exterior walls
bullet05/24, John & Jared watered trees!
bullet05/23, Started framing walls
bullet05/23, Propane gas tank was delivered
bullet05/23, Geoff, Dad & kids 'marked' trees
bullet05/23, Geoff & Dad finished planting trees
bullet05/21, Filled porch with dirt
bullet05/21, Started filling garage with gravel
bullet05/21, Smoothed backfill & moved dirt
bullet05/21, Graveled the drive
bullet05/20, Laid out first floor
bullet05/18, Finished laying decking
bullet05/17, Started laying decking, we had wanted the decking screwed on, but there was a communication break-down with the framer
bullet05/17, Attached ledger at ends of trusses
bullet05/17, Built center support in basement
bullet05/17, Finished floor trusses
bullet05/16, Started putting on floor trusses
bullet05/14, Geoff started stuccoing the exposed basement wall
bullet05/13, Put sill plate on basement walls
bullet05/13, Forms off the porch & garage walls, small problem - large garage door was suppose to be 18' not 16' - so we will have to cut that back.
bullet05/11, Poured porch & garage walls
bullet05/10, Began grinding down basement floor, it was decided to try to grind down the floor and coat it with the CTI System www.cti-corp.com
bullet05/10, Porch & garage footings poured
bullet05/07, Geoff began planting trees
bullet05/03, Replacement roof trusses arrive
bullet05/03, First order of framing materials arrive

 

April 2005 Status

bullet04/27, Basement floor poured, the wind picked up during the pour, and without water, it got away from them.  So, it will either have to be ripped out and redone, or smoothed.  A week or so later, cracks formed.
bullet04/25, Floor trusses were delivered
bullet04/25, Rough backfill done
bullet04/25, Basement floor prep
bullet04/19, Put black tarp over basement walls
bullet04/18, Hit problem, when the lumber yard came out to double check measurements before ordering the floor trusses, it was discovered that the basement wall dimensions were not right. The width and the length were both over by 9".  So, we had to have the house plans modified, and re-order new roof trusses - again. Turns out the error was in understanding the plans as they were drawn.
bullet04/18, Finished rough-in plumbing in basement
bullet04/18, Finished electrical panel
bullet04/15, Roof trusses were delivered, but the package was not right.
bullet04/15, Poured concrete into basement walls
bullet04/14, Finished laying blocks
bullet04/13, Started laying Styrofoam blocks
bullet04/11, Created electric panel
bullet04/09, Finished basement tile & gravel
bullet04/08, Dug trench for power lines
bullet04/05, Finished pouring footings
bullet04/04, Finished setting forms for footings
bullet04/03, Finished gravel bed for foundation

 

March 2005 Status

bullet03/30, Excavation finished.
bullet03/29, Excavation continues
bullet03/28, Broke ground
bullet03/28, Worked on walkout slope
bullet03/28, Staked house & inspection
bullet03/26, Ordered all exterior materials
bullet03/20, Cultivated dirt hill
bullet03/18, Closed on construction loan
bullet03/11, Finalized house plans

 

October 2004 Status

bullet10/11, Still working on budget, would like to start digging hole first part of November.
bullet10/11, We ran 1000ft of drainage tile!! We had Hagar Backhoe run drainage tile across our property.  That should insure we don't have any water in the basement!!
bullet10/06, Sent out change of address postcards

 

September 2004 Status

bullet9/30, We moved closer into a rental home ... now instead of 3hrs away, we are 20mins.  Geoff stayed behind for 4-6wks to repair our house to sell, and transition his job
bullet9/17, Have new bids for materials
bullet9/04-5, We moved some dirt!! We used an elevated scraper to create 4' slope for our walkout basement.  We also found a drainage tile on the other side of the property that we can hook into to clear out water!

 

August 2004 Status

bullet8/31, Dropped off new plans for 3 materials bids, 1 plumbing/heating/electrical bid, and 1 labor bid
bullet8/30, Have new plans back from architect for Plan B (changes that were found last week to reduce complexity)
bullet8/28, Have 2 of 2 bids for electrical
bullet8/25, Have 1 of 2 bids for masonry, we are looking at cast stone instead of real stone (cost)
bullet8/25, Have 1 of 2 bids for framing & finishing labor
bullet8/25, Have 3 of 4 bids for interior painting
bullet8/23, Looking at Plan B - alternative approach for roof & porch, trying to cut cost - main floor and basement will remain mostly the same, the roof would be changed to room-in-attic trusses, and the porches would be cut back by more than half
bullet8/21, Have 2 of 2 bids for plumbing & heating
bullet8/20, Have 1 of 2 bids for drywall
bullet8/16, Have 3 of 5 materials bids for SIPS panels
bullet8/16, Possibly turning away from SIPS, we are having trouble finding interested affordable labor - looking at traditional stick built or factory built panels, then spraying exterior walls/roof with 3" foam
bullet8/16, Have 1 of 2 bids for plumbing, heating, & electrical
bullet8/10, Have 1of 4 material bids for framing lumber (interior house, garage, windows, doors), roof (metal or asphalt), siding (cedar or cypress, board n' batten or shakes), and soffit
bullet8/7, Have labor/materials bid for septic system, gravel, and crane rental
bullet8/6, Have labor/materials bid for concrete (foundation, walkout, basement/garage floor)
bullet8/6, Have 2 of 5 materials bids for SIPS panels

 

July 2004 Status

bullet7/28, Have 5 of 5 bids for windows
bullet7/19, Met with architect, we now have 12 copies of our final plans!! Now back to the budget!
bullet7/16, Picked up near final plans
bullet7/02, Sent in 2nd Revisions to architect

 

June 2004 Status

bullet6/21, Picked up 1st revisions
bullet6/03, Dropped on 1st revisions

 

May 2004 Status

bullet5/24, Picked up initial house plans

 

April 2004 Status

bulletMet with architect, dropped on house plans
bullet4/12, Drilled well
bullet4/12, Obtained well permit
bullet4/12, Obtained sewer permit
bullet4/12, Temp electricity hooked up

 

March 2004 Status

bulletWorking on house plans

 

February 2004 Status

bulletWorking on house plans
bullet2/02, Closed on land purchase

 

 Copyright or other proprietary statement goes here.
For problems or questions regarding this web contact

Last updated: 06/06/05.